At a glance

  • Brick wall: number of bricks, cement bags and sand for a 9-inch or 4.5-inch wall, minus doors and windows, in 1:4, 1:5 or 1:6 mortar.
  • Concrete: cement, sand, aggregate (gitti) and water for slabs, beams, columns and footings in M10, M15, M20 or M25 nominal mix.
  • Plaster: cement and sand for 12, 15 or 20 mm plaster on any area.
  • Uses the standard site factors: dry volume = wet × 1.33 (brick mortar), × 1.54 (concrete), and plaster + 20% for joints then × 1.27; cement at 1,440 kg/m³ in 50 kg bags.
  • Sizes in feet or metres; sand and aggregate in cubic feet, m³ and brass.
  • Add your local prices for an estimate of the material cost.

Step by step

How to calculate construction materials

  1. 1

    Choose the work

    A brick wall, concrete (slab, beam, column, footing) or plaster.

  2. 2

    Enter the sizes

    Length, height or width, and thickness — in feet or metres. Deduct doors and windows from walls.

  3. 3

    Pick the mix

    Mortar ratio for brickwork and plaster, or the concrete grade.

  4. 4

    Read the quantities

    Bricks, cement bags, sand and aggregate, and the cost at your rates.

Features

Everything you need, nothing you don’t

Bricks and mortar

9-inch and 4.5-inch walls.

Concrete mixes

M10 to M25, any shape.

Plaster

12, 15 or 20 mm.

Feet or metres

cft, m³ and brass.

Standard factors

The ones engineers use.

Material cost

At your local rates.

Quick reference (per cubic metre)

Plaster, 12 mm thick in 1:6 over 100 m² (about 1,076 sq ft), needs about 7.5 bags of cement and 1.57 m³ (55 cft) of sand. Figures exclude wastage.

WorkCementSandAggregate
Brickwork, modular bricks, 1:61.26 bags + about 500 bricks0.26 m³ (9.3 cft)—
M15 concrete (1:2:4)6.3 bags0.44 m³ (15.5 cft)0.88 m³ (31.1 cft)
M20 concrete (1:1.5:3)8.1 bags0.42 m³ (14.8 cft)0.84 m³ (29.7 cft)
M25 concrete (1:1:2)11.1 bags0.39 m³ (13.6 cft)0.77 m³ (27.2 cft)

How it’s worked out

Wet concrete is measured after compaction, but cement, sand and aggregate are bought loose, with air between the grains — so the dry volume is about 54% more (× 1.54). The dry volume is split by the mix: for M20 (1 : 1.5 : 3, 5.5 parts), cement is 1.54 ÷ 5.5 = 0.28 m³ per m³ of concrete, which is 0.28 × 1,440 ÷ 50 ≈ 8 bags. Brick mortar uses × 1.33 because the mortar only fills the joints.

FAQ

Frequently asked questions

How many bricks are in 1 m³ of brickwork?

About 500 modular bricks (190 × 90 × 90 mm with 10 mm joints). With traditional 230 × 110 × 75 mm bricks it is about 400. Add around 5% for breakage.

How many cement bags for 1 m³ of M20 concrete?

About 8 bags (50 kg each) in a 1 : 1.5 : 3 nominal mix, with 0.42 m³ of sand and 0.84 m³ of aggregate.

What is a brass?

A measure used for sand and aggregate in many parts of India: 1 brass = 100 cubic feet (about 2.83 m³).

Which mortar ratio should I use?

1:6 is common for 9-inch walls and inner plaster, 1:4 for 4.5-inch walls and outer plaster. Follow your engineer’s specification.

Does it include steel?

No. Reinforcement depends on the structural design; ask your engineer for the bar schedule.

Why does my contractor’s figure differ?

Site practice, brick sizes, joint thickness, wastage and design mixes vary. Use this as a check and for ordering, not as a structural design.

Keep going

Browse every tool

Last updated Report a problem or suggest a feature